Copyright (C) Daniel Stenberg, <daniel@haxx.se>, et al.
|
||||
|
||||
SPDX-License-Identifier: curl
|
||||
-->
|
||||
|
||||
curl release procedure - how to do a release
|
||||
============================================
|
||||
|
||||
in the source code repo
|
||||
-----------------------
|
||||
|
||||
- edit `RELEASE-NOTES` to be accurate
|
||||
|
||||
- update `docs/THANKS`
|
||||
|
||||
- update the "past releases" section in `docs/VERSIONS.md`
|
||||
|
||||
- make sure all relevant changes are committed on the master branch
|
||||
|
||||
- tag the git repo in this style: `git tag -a curl-7_34_0`. -a annotates the
|
||||
tag and we use underscores instead of dots in the version number. Make sure
|
||||
the tag is GPG signed (using -s).
|
||||
|
||||
- run `./scripts/dmaketgz 7.34.0` to build the release tarballs.
|
||||
|
||||
- push the git commits and the new tag
|
||||
|
||||
- GPG sign the 4 tarballs as `maketgz` suggests
|
||||
|
||||
- upload the 8 resulting files to the primary download directory
|
||||
|
||||
in the curl-www repo
|
||||
--------------------
|
||||
|
||||
- edit `Makefile` (version number and date),
|
||||
|
||||
- edit `_newslog.html` (announce the new release) and
|
||||
|
||||
- edit `_changes.html` (insert changes+bugfixes from RELEASE-NOTES)
|
||||
|
||||
- commit all local changes
|
||||
|
||||
- tag the repo with the same name as used for the source repo.
|
||||
|
||||
- make sure all relevant changes are committed and pushed on the master branch
|
||||
|
||||
(the website then updates its contents automatically)
|
||||
|
||||
on GitHub
|
||||
---------
|
||||
|
||||
- edit the newly made release tag so that it is listed as the latest release
|
||||
|
||||
inform
|
||||
------
|
||||
|
||||
- send an email to curl-users, curl-announce and curl-library. Insert the
|
||||
RELEASE-NOTES into the mail.
|
||||
|
||||
- if there are any advisories associated with the release, send each markdown
|
||||
file to the above lists as well as to `oss-security@lists.openwall.com`
|
||||
(unless the problem is unique to the non-open operating systems)
|
||||
|
||||
celebrate
|
||||
---------
|
||||
|
||||
- suitable beverage intake is encouraged for the festivities
|
||||
|
||||
curl release scheduling
|
||||
=======================
|
||||
|
||||
Release Cycle
|
||||
-------------
|
||||
|
||||
We normally do releases every 8 weeks on Wednesdays. If important problems
|
||||
arise, we can insert releases outside the schedule or we can move the release
|
||||
date.
|
||||
|
||||
Each 8 week (56 days) release cycle is divided into three distinct periods:
|
||||
|
||||
- During the first 10 calendar days after a release, we are in "cool down". We
|
||||
do not merge features but only bug-fixes. If a regression is reported, we
|
||||
might do a follow-up patch release.
|
||||
|
||||
- During the following 3 weeks (21 days) there is a feature window: we allow
|
||||
new features and changes to curl and libcurl. If we accept any such changes,
|
||||
we bump the minor number used for the next release.
|
||||
|
||||
- During the next 25 days we are in feature freeze. We do not merge any
|
||||
features or changes, and we only focus on fixing bugs and polishing things
|
||||
to make the pending release a solid one.
|
||||
|
||||
If a future release date happens to end up on a "bad date", like in the middle
|
||||
of common public holidays or when the lead release manager is unavailable, the
|
||||
release date can be moved forwards or backwards a full week. This is then
|
||||
advertised well in advance.
|
||||
|
||||
Release Candidates
|
||||
------------------
|
||||
|
||||
We ship release candidate tarballs on three occasions in preparation for the
|
||||
pending release:
|
||||
|
||||
- Release candidate one (**rc1**) ships the same Saturday the feature freeze
|
||||
starts. Twenty-five days before the release. Tagged like `rc-7_34_0-1`.
|
||||
|
||||
- Release candidate two (**rc2**) ships nine days later, sixteen days before
|
||||
the release. On a Monday. Tagged like `rc-7_34_0-2`.
|
||||
|
||||
- Release candidate tree (**rc3**) ships nine days later, seven days before
|
||||
the release. On a Wednesday. Tagged like `rc-7_34_0-3`.
|
||||
|
||||
Release candidate tarballs are ephemeral and each such tarball is only kept
|
||||
around for a few weeks. They are provided on their dedicated webpage at:
|
||||
https://curl.se/rc/
|
||||
|
||||
The git tags for release candidate are temporary and remain set only for a
|
||||
limited period of time.
|
||||
|
||||
**Do not use release candidates in production**. They are work in progress.
|
||||
Use them for testing and verification only. Use actual releases in production.
|
||||
|
||||
Critical problems
|
||||
-----------------
|
||||
|
||||
We can break the release cycle and do a patch release at any point if a
|
||||
critical enough problem is reported. There is no exact definition of how to
|
||||
assess such criticality, but if an issue is highly disturbing or has a
|
||||
security impact on a large enough share of the user population it might
|
||||
qualify.
|
||||
|
||||
If you think an issue qualifies, bring it to the curl-library mailing list and
|
||||
push for it.
|
||||
|
||||
Coming dates
|
||||
------------
|
||||
|
||||
Based on the description above, here are some planned future release dates:
|
||||
|
||||
- May 28, 2025
|
||||
- July 16, 2025
|
||||
- September 10, 2025
|
||||
- November 5, 2025
|
||||
- January 7, 2026
|
||||
- March 4, 2026
|
||||
- April 29, 2026
|
||||